Starting a home remodel can feel confusing when homeowners are unsure where to start a house renovation. Many projects run into delays and cost overruns because cosmetic upgrades are prioritized before proper planning.

The first step is to define goals, set a realistic budget, and plan the project scope before any demolition or construction begins. This preparation helps protect the timeline, budget, and structural safety of the home.

Following a clear renovation roadmap allows each construction phase to build on the previous one, helping homeowners avoid costly mistakes and maintain project control.

Table of Contents +

Where to start house renovation

How to Plan a Home Renovation in 3 Phases

Professional renovations follow a strict sequence to ensure the building remains safe and the budget stays on track. Each phase builds upon the last to create a streamlined workflow for the entire crew.

Phase 1: Planning Your Home Renovation

The first step in renovating a house involves setting your financial boundaries and defining the project scope. You must finalize these details during the design phase to avoid mid-project changes that drive up costs:

  1. Needs vs Wants Audit: List every structural repair required to make the home safe before adding cosmetic upgrades.
  2. Budget Planning: Calculate your total available funds and set aside up to a 20% contingency for hidden issues behind the walls.
  3. Hiring a Team: Select a design-build firm to ensure your architectural plans align with your actual construction budget.

Phase 2: Logistics and Pre-Construction

How to start a home remodel effectively requires managing legal paperwork and material orders long before demolition begins. Use this time to build a realistic project timeline and secure your home:

  1. Permits and Codes: Submit all necessary structural, electrical, and plumbing plans to the city for official approval.
  2. Material Sourcing: Order long-lead items like custom cabinets and windows to ensure they arrive before they are needed on-site.
  3. Renovation Roadmap: Create a livability plan that identifies where your family will cook and sleep during the heavy construction weeks.

Phase 3: Construction Sequence for a Smooth Remodel

Once the paperwork is ready, the physical work moves from the exterior shell to the interior details. Following these house renovation steps protects the new work from being damaged by later phases:

  1. Demolition and Structural: Remove old materials and repair the foundation or framing to create a solid base.
  2. Mechanical Rough-ins: Install new HVAC ducts, plumbing pipes, and electrical wiring while the wall studs are exposed.
  3. Closing and Finishes: Complete the insulation and drywall before moving to flooring, cabinetry, and final fixture installation.

Common Mistakes Most Homeowners Make

Many people fail because they treat a remodel like a series of small DIY tasks rather than a complex system. Avoiding these frequent errors will keep your project moving forward without costly setbacks:

  • Skipping Professional Planning: Attempting to manage your own permits and vendors usually leads to timeline delays and expensive rework.
  • The Design-Budget Disconnect: Hiring separate architects and contractors can result in beautiful plans that exceed your actual construction budget.
  • Ignoring Energy Efficiency: Homeowners often miss the chance to upgrade insulation and air sealing while the home is already stripped to the studs.

Start Your Home Renovation the Right Way

Taking the right first step determines whether your project adds value to your life or becomes a source of constant stress. By prioritizing the planning phase and adhering to a logical construction sequence, you protect your investment and ensure a high-quality result. A well-executed home transformation relies on professional coordination to turn your vision into a reality that stays within your financial and legal boundaries.

3 Day Kitchen & Bath helps you navigate this complex process by providing expert guidance from the initial design through the final installation. Our team specializes in home remodeling in San Diego, creating a seamless transition from your initial ideas to a fully realized, high-quality remodel.

House Renovation

Frequently Asked Questions

What is the first thing to do when renovating a house?

The first thing you must do is define your budget and project scope during the planning phase to avoid financial surprises later.

In what order should you renovate a house?

You should always start with structural and mechanical repairs (plumbing and electrical) before moving to cosmetic finishes like paint and flooring.

Who do I hire first for a renovation?

You should hire a design-build firm first so they can handle the design, budgeting, and construction under one roof.

How do I plan a whole house renovation?

Start by auditing the home's needs, securing a 20% contingency fund, and mapping out a timeline for permits and material orders.

How long does it take to start a renovation?

The pre-construction phase typically takes 2 to 4 months, depending on the design scope and local city permit approval timelines.